NQE was engaged by Port of Townsville to design and certify a heavy vehicle bridge for use on one of its berths.
The bridge was required to facilitate access of up to 30 tonne mobile cranes between mooring platforms. The client also specified that the bridge must be able to be pick-and-carried by their 20 tonne Franna crane. NQE consulted the OEM load chart and ensured that the overall dimensions and weight of the heavy vehicle bridge would allow it to be safely transported into place as required. NQE also produced shop detailed drawings, allowing Port of Townsville boilermakers to fabricate the bridge in-house.
Design features include:
Contact NQE toady to discuss your project.